The cabinets had been built mostly off-site
so things changed very quickly this last week.
Kitchen
The back wall cabinets and the range hood details are being
finalized now but it's fun to see that big island going in.
Not to mention the pantry! (Left-side entrance)
The temporary steps have been removed
and replaced with the real deal on both stairs.
Trim is being added.
A peek into the master bath. Clothing closet cabinets
are in but awaiting shelving; lavatory closet cabinets
and shelving are in.
Quilt studio doors installed.
Quilt studio closet is huge: space to hang quilts
and store large rolls of batting, along with a bit of
Note the sliding window to pass out drinks to pool-go'ers!
The pool: sun shelf and steps on this end; 7-8' deep end.
A drop in elevation at the end of the pool will be finished
off with steps down to a firepit and seating to enjoy that
great view to the lake.
Up next: brick, rock and concrete
Comments
Post a Comment