Sheetrock & Siding Complete; Cabinets and Pool Begin

Things have really picked up over the last few weeks.


The siding has been completed.



The entire house has been sheetrocked...


and mudded.


Master bedroom.


Sewing studio.


Living room.


Upstairs.

Next, cabinets began arriving.



Pantry.


Master bath.


Bar.

The pool construction has also begun.




Over the next weeks should be the brick and rock.

Light fixtures and ceiling fans, trim walk-through
(closets, stairs, etc) and finalizing the one last cabinet
design (kitchen back wall/range hood design) are all
finally behind us.  Next up, choosing paint colors.

Comments