Late-July Progress Update


Windows & outer doors are in; just
waiting for front door (special order) to arrive.


The framers finished a couple weeks ago though there
are a few things that still need adjusted.


Main garage


Great room


Bonus (play) room


Upstairs landing


Upstairs en suite


Looking down to great room (indoor fireplace inserts are in)





Kitchen (butler's pantry behind) & dining
(pics on master bed, bath & closet coming soon...)


The 4+ hour electrical walkthrough was a bit rough
but we came prepared.  How long would it have
taken without our room-by-room, detailed list?!?


The HVAC & plumbers are making progress.  


Looking out from dining door; awaiting the deck!


We're sure hoping this cutey will have no interest
 in our landscape plants, herbs and veg garden.


To date we've chosen faucets, sinks, countertops, tile...


...flooring, showers and tubs, toilets...


...brick and stone.


Over this last week, we've focused a lot on cabinetry.
We've chosen hickory in the above design for the doors.

One wall of the butler's pantry

With everything custom-built, a lot of thought
has been put into the layout, most especially in the
kitchen, butler's pantry, laundry room and bar.


Ideas for the range hood.